
The
need for a documented quality system has never been greater as more and more
services are being asked of custom injection molders. OEM's want parts and
sub-assemblies to go right onto the production lines with the quality assured by
the supplier.
The
Plastics Group is currently finishing a major upgrade to our Quality Assurance
Program, first instituted in 1985. As of June 1, 2000 all documents will
be computer controlled via software dedicated to document control.
With our Total Quality System every department from
customer service through production to shipping is documented and cross
checked. This same system is used by PEL to control engineering and design
projects.
From upper management through the production floor,
a company wide commitment to continuously improve quality enables The Plastics
Group
to
supply our clients with the right part at
the right time at the right
cost.